PLC⌕
Kuka

130593

ES empty for valve terminal A3-A6

The dress package of the energy supply system contains the hoses and cables for fluids and signals and the flexible tube. In the case of an “energy supply system without supply lines”, an empty flexible tube with fastening materials is supplied.

BrandKuka
Weight1.37 kg

Not currently in stock

Price on request
Request sourcing Ask a question