PLC⌕
Kuka

166353

ES handling Multibus 2x air, A1-3, K box

The dress package of the energy supply system contains the hoses and cables for fluids and signals and the flexible tube. In the case of an “energy supply system without supply lines”, an empty flexible tube with fastening materials is supplied.

BrandKuka
Weight30 kg

Not currently in stock

Price on request
Request sourcing Ask a question